Company Profile
Rabily (Kunshan) Manufacturing Co., Ltd. Headquartered in Shanghai with factories located at cities around Shanghai of KunShan, SuZhou, Taicang and Yancheng. Rabily proivdes customers with mechanical parts and even assembly service through various manufacturing processes.
Headquarter and Subsidiaries
Location | Covering area | Business |
Shanghai Headquarter | 1000 square metre | R&D,Financial,Sales |
Kunshan CNC Factory | 2500 square metre | Manufacturing Hub, Project, Customer Service |
Kunshan Plastic Injection Factory | 3500 square metre | Plastic (PC/ABS/PA) Injection Products |
Suzhou Sheetmetal Factory | 3000 square metre | Sheetmetal, Stamping Products |
Suzhou Die Casting Factory | 3000 square metre | Die Casting Products |
Taicang | 5000 square metre | Fastener |
Yancheng | 6000 square metre | Mass Production Base, CNC+Die Casting+Painting |
FAQ
1.How can I get quotation and feedback for my products?
Provide your 2D drawings with specifications (material, surface treatment, tolerance, other requirement, etc.); Please inform your quantity usage (MOQ and annual need) and logistic requirement; 3D drawings are much welcome for full product review.
2.How long can I get the quaotation?
Normally, we can provide instant feedback and then provide quotation within 48 hours
3.How long will you produce the parts?
Production lead time for CNC machining is 1-4wks, according to difference products and quantity. We will communicate with Customers on production plan and delievery for each PO.
If a mold is needed, the mold making time will be:
1) 2-3wks for extrusion molds
2) 4-8wks for die casting molds or plastics injection molds
3) 2-3wks for stamping molds
4.What's your payment terms
1) Especailly for new customers: T/T in advance or 50% T/T in advance, left needs to be wired before delivery.
2) L/C
5.Incoterms:
1) Ex-works or FOB Shanghai, is preferied;
2) CIF
3) DDP: need further communication on cost & logistics issues with Customers
6.Shipment: By Air or Ocean
Normally by air for samples (if not too heavy)
7.Will you sign NDA?
Yes, NDA is necessary between us.